(Springfield’s News Talk 104.1) – Missouri Route 125 will be closed at U.S. Route 60 in Rogersville starting Thursday.
These closures will begin Phase 4 of the Interchange Project.
Phase 4 of this project is expected to last until the end of May
Drivers should be ready for the following traffic impacts:
- Route 125 CLOSED at Route 60
- Route 60 to Route 125 right turns only, no left turns allowed
- Route 125 to Route 60 right turns only, no left turns allowed
- Route 60 open in both directions
- Signals removed at Route 60 and Route 125
- Both directions of Route 60 are reduced to two 10′ lanes in each direction
- Speed is reduced to 50 mph in the work zone
- Route 60 crossover medians temporarily CLOSED for up to 6 months at the following locations: – Farm Road 205 – Harmony Avenue – Farm Road 213 – Farm Road 219 – Farm Road 223 – Farm Road 241.
It looks like you are not a member of VIP Club yet. Please fill out the form below to access the page and join the VIP Club